Run this checklist when a 3500 Monitoring System unit goes into a rack for the first time — it covers the checks that prevent the classic first-month callbacks.
Key points at a glance
- 3500/42M monitors radial and axial vibration in 4 channels per module
- Rack configuration lives in the 3500/20 interface — spare cards restore in minutes
- The 3500/25 keyphasor provides the phase reference the whole rack relies on
- 3500/32 relays convert alarms into hard-wired trips
- 3500/92 gateway and 3500/22M TDI connect the rack to DCS and System 1
Record gap voltages and alarm setpoints in the commissioning sheet — the numbers you capture on day one are the baseline every future diagnostic compares against.
Related products in stock
Control Units & Monitors · Industry Applications
Ordering and support
Need the full datasheet, a wiring drawing, or help matching a part number? Send the model or nameplate photo to TenBN — our team answers with availability, price, and documents within one business day.